Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 10/28/2026 at 9:30pm; Resumed Operation on 10/28/2026 by 10:11pm
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 10/28/2026 at 9:30pm; Resumed Operation on 10/28/2026 by 10:11pm On Wednesday, October 28, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 9:30pm due to flame failure. Flare 2 resumed operation on October 28, 2026, at approximately 10:11pm. Under Condition 81 of the…
