Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 9/17/2026 at 4:07am; Resumed Operation on 9/17/2026 by 5:11am
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 9/17/2026 at 4:07am; Resumed Operation on 9/17/2026 by 5:11am On Thursday, September 17, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 4:07am due to flame failure. Flare 2 resumed operation on September 17, 2026, at approximately 5:11am. The downtime of Flare 3…
