Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/17/2026 at 2:03 pm; Resumed Operation on 7/17/2026 by 3:14 pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/17/2026 at 2:03 pm; Resumed Operation on 7/17/2026 by 3:14 pm On Friday, July 17, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 2:03 pm due to flame failure. The Parnel TOx resumed operation at approximately 3:14 pm. The downtime of…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/17/2026 at 10:44 am; Resumed Operation on 7/17/2026 by 1:16 pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/17/2026 at 10:44 am; Resumed Operation on 7/17/2026 by 1:16 pm On Friday, July 17, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 10:44 am due to flame failure. The Parnel TOx resumed operation at approximately 1:16 pm. The downtime of…

Read article