Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 6/24/2026 at 12:08 pm; Resumed Operation on 6/24/2026 by 1:30 pm
On Wednesday, June 24, 2026, Chiquita experienced unplanned downtime of Flare 1 at 12:08 pm and Flare 2 at 12:10pm due to high liquid levels in the knock out pot. Flare 1 resumed operation at 1:04 pm and Flare 2 at 1:30 pm. The downtime for Flare 1 lasted for a total of 56 minutes and the downtime for Flare 2 lasted for a total of 1 hour and 20 minutes. Due to this downtime, there was a possibility of increased odors in the community during the indicated time period.
Under Condition 81 of the Modified Stipulated Order for Abatement in Case No. 6177-4, Chiquita Canyon, LLC (Chiquita) is required to notify the community (i) if any individual control device has downtime which is anticipated to last 30 minutes or more or once any downtime for an individual control device reaches 30 minutes of downtime or (ii) if the downtime of any combination of landfill gas collection equipment results or is planned to result in a reduction of gas flow to control devices by 10% or more and the downtime is anticipated to last 30 minutes or more or once any downtime for such devices reach 30 minutes of downtime. Pursuant to Condition 81, Chiquita is also required to notify the community once the gas collection and control equipment has resumed operation.
Chiquita continues to work to diligently comply with regulator orders.