Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/21/2026 at 5:33am; Resumed Operation on 11/21/2026 by 7:22am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/21/2026 at 5:33am; Resumed Operation on 11/21/2026 by 7:22am On Saturday, November 21, 2026, Chiquita experienced unplanned downtime of Flares 1, 2, and 3 at approximately 5:33am due to power failure, and the Parnel TOx at approximately 5:38am due to high temperature shutdown resulting…

Read article