Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/19/2026 at 6:38am; Resumed Operation on 11/19/2026 by 7:43am
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/19/2026 at 6:38am; Resumed Operation on 11/19/2026 by 7:43am On Thursday, November 19, 2026, Chiquita experienced unplanned downtime of the Zeeco #2 TOx at approximately 6:38am due to flame failure. The Zeeco #2 TOx resumed operation on November 19, 2026, at approximately 7:43am. Under…
