Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/14/2026 at 6:09pm; Resumed Operation on 11/15/2026 by 3:19am
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/14/2026 at 6:09pm; Resumed Operation on 11/15/2026 by 3:19am On Saturday, November 14, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 6:09pm due to flame failure. The Parnel TOx resumed operation on November 15, 2026, at approximately 3:19am. Under Condition 81…
