Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 11/7/2026 by 9:08am
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 11/7/2026 by 9:08am As previously noticed, on Friday, November 6, 2026, Chiquita experienced unplanned downtime of Flares 2 and 3 at approximately 8:36pm due to flame failure and high flow, respectively. Flares 2 and 3 resumed operation by November 7, 2026, at approximately 8:47am…
