Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/3/2026 at 11:39pm; Resumed Operation on 11/4/2026 by 6:21am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/3/2026 at 11:39pm; Resumed Operation on 11/4/2026 by 6:21am On Tuesday, November 3, 2026, Chiquita experienced unplanned downtime of Flare 1 and Flare 3 at approximately 11:39pm and 11:40pm, respectively, due to low temperature and high flow, respectively. Flare 1 and Flare 3 resumed…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/3/2026 at 8:46pm; Resumed Operation on 11/3/2026 by 9:54m

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/3/2026 at 8:46pm; Resumed Operation on 11/3/2026 by 9:54m On Tuesday, November 3, 2026, Chiquita experienced unplanned downtime of Flare 1 at approximately 8:46pm due to low temperature. Flare 1 resumed operation on November 3, 2026 at approximately 9:54pm. Under Condition 81 of the…

Read article