Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/1/2026 at 3:40pm; Resumed Operation on 11/1/2026 by 9:40pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/1/2026 at 3:40pm; Resumed Operation on 11/1/2026 by 9:40pm On Sunday, November 1, 2026, Chiquita experienced unplanned downtime of Flares 2 and 3 at approximately 3:39pm due to flame failure and high flow, respectively. Flare 2 and Flare 3 resumed operation at approximately 4:32pm…

Read article