Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/1/2026 at 6:30am; Resumed Operation on 11/1/2026 by 7:59am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/1/2026 at 6:30am; Resumed Operation on 11/1/2026 by 7:59am On Sunday, November 1, 2026, Chiquita experienced unplanned downtime of Flares 2 and 3 at approximately 6:30am due to flame failure and high flow, respectively. Flare 2 resumed operation on November 1, 2026 at approximately…

Read article