Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 10/21/2026 by 11:17am
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 10/21/2026 by 11:17am As previously noticed, on Tuesday, October 20, 2026, Chiquita experienced unplanned downtime of Flares 1 and 2 at approximately 10:27pm and 10:06pm due to low temperature and flame failure, respectively. Flares 1 and 2 resumed operation by Wednesday, October 21, 2026,…
