Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 10/17/2026 at 9:47am; Resumed Operation on 10/17/2026 by 6:10pm
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 10/17/2026 at 9:47am; Resumed Operation on 10/17/2026 by 6:10pm On Saturday, October 17, 2026, Chiquita experienced unplanned downtime of Flare 1 and Flare 2 at approximately 9:48am and 9:47am due to low temperature and flame failure, respectively. Flare 1 and Flare 2 resumed operation…
