Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 9/8/2026 by 8:30pm
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 9/8/2026 by 8:30pm As previously noticed, on Monday, September 7, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 7:20am due to high flow and pilot issues. Flare 2 resumed operations by September 8, 2026, at 8:30pm. Under Condition 81 of the Modified…
