Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/30/2026 at 5:55am; Resumed Operation on 8/30/2026 by 6:50am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/30/2026 at 5:55am; Resumed Operation on 8/30/2026 by 6:50am On Sunday, August 30, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 5:55am due to flame failure. Flare 2 resumed operation on August 30, 2026, at approximately 6:50am. The downtime of Flare 2…

Read article