Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 8/23/2026 at 8:45am
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 8/23/2026 at 8:45am As previously noticed, on Saturday, August 22, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 11:06pm due to flame failure. Flare 2 was restarted on August 23, 2026 at 6:09am, but then experienced another downtime at 7:45am. Flare 2…
