Corrected Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/27/2026 at 12:13 pm
Corrected Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/27/2026 at 12:13 pm On Monday, July 27, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 12:13 pm due to flame failure. The Parnel TOx resumed operation on July 28 at approximately 7:34 am. Due to this downtime, there was…
