Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/27/2026 at 12:13 pm; Resumed Operation on 7/27/2026 by 2:00 pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/27/2026 at 12:13 pm; Resumed Operation on 7/27/2026 by 2:00 pm On Monday, July 27, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 12:13 pm due to flame failure. The Parnel TOx resumed operation at approximately 2:00 pm. The downtime of…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/27/2026 at 3:41 am; Resumed Operation on 7/27/2026 by 4:50 am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/27/2026 at 3:41 am; Resumed Operation on 7/27/2026 by 4:50 am On Monday, July 27, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 3:41 am due to flame failure. Flare 2 resumed operation at approximately 4:50 am. The downtime of Flare 2…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/27/2026 at 3:24 am; Resumed Operation on 7/27/2026 by 7:24 am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/27/2026 at 3:24 am; Resumed Operation on 7/27/2026 by 7:24 am On Monday, July 27, 2026, Chiquita experienced unplanned downtime of the Zeeco TOx #7 at approximately 3:24 am due to the VFD tripping. The Zeeco TOx #7 resumed operation at approximately 7:24 am.…

Read article