Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/21/2026 at 12:54 am; Resumed Operation on 7/21/2026 by 4:18 am
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/21/2026 at 12:54 am; Resumed Operation on 7/21/2026 by 4:18 am On Tuesday, July 21, 2026, Chiquita experienced unplanned downtime of Flares 2 and 3 at approximately 12:54 am due to flame failure. Flare 2 was restarted at 1:44 am and Flare 3 was…
