Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/12/2026 at 3:46 pm; Resumed Operation on 7/12/2026 by 4:54 pm
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/12/2026 at 3:46 pm; Resumed Operation on 7/12/2026 by 4:54 pm On Sunday, July 12, 2026, Chiquita experienced unplanned downtime of Flares 1, 2, and 3 at approximately 3:46 pm due to flame failure. Flares 1, 2, and 3 resumed operation by approximately 4:54…
