Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 7/9/2026 at 8:34 am
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 7/9/2026 at 8:34 am As previously noticed, on Thursday, 7/9/2026, Chiquita experienced planned downtime of Flare 3 at approximately 8:02 am to calibrate the pressure flow meter on the combustion mix blower. Flare 3 resumed operations by 7/9/2026 at approximately 8:34 am. Under Condition…
