Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 7/5/2026 at 8:15 am
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 7/5/2026 at 8:15 am As previously noticed, on Saturday, 7/4/2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 10:37 am due to pilot failure. The Parnel TOx resumed operations by 7/5/2026 at approximately 8:15 am. Under Condition 81 of the Modified Stipulated…
