Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 6/27/2026 at 8:45 am
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 6/27/2026 at 8:45 am As previously noticed, on 6/27/2026, Chiquita experienced unplanned downtime of Flare 3 at approximately 2:50 am due to flame failure. Flare 3 resumed operation by 6/27/2026 at approximately 8:45 am. Under Condition 81 of the Modified Stipulated Order for Abatement…
