Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 6/14/2026 at 10:31 pm; Resumed Operation on 6/15/2026 at 6:40 am
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 6/14/2026 at 10:31 pm; Resumed Operation on 6/15/2026 at 6:40 am On Sunday, June 14, 2026, Chiquita experienced unplanned downtime of Flare 2 at 10:31 pm due to flame failure. This downtime lasted for 8 hours and 9 minutes, and Flare 2 resumed operation…
