Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 6/13/2026 at 9:54 pm; Resumed Operation on 6/14/2026 at 8:45 am
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 6/13/2026 at 9:54 pm; Resumed Operation on 6/14/2026 at 8:45 am On Saturday, June 13, 2026, Chiquita experienced unplanned downtime of Flare 2 at 9:54 pm due to flame failure. This downtime lasted for 10 hours and 51 minutes, and Flare 2 resumed operation…
