Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 6/9/2026 at 9:34 pm; Resumed Operation on 6/9/2026 at 11:16 pm
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 6/9/2026 at 9:34 pm; Resumed Operation on 6/9/2026 at 11:16 pm On Tuesday, June 9, 2026, Chiquita experienced unplanned downtime of Flare 2 at 9:34 pm due to flame failure. This downtime lasted for 1 hour and 42 minutes, and Flare 2 resumed operation…
