Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 6/4/2026 at 12:02 am
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 6/4/2026 at 12:02 am On 6/3/2026, Chiquita experienced unplanned downtime of Flare 3 at 9:23 pm due to flame failure. Flare 3 resumed operation on 6/4/2026 at 12:02 am. Under Condition 81 of the Modified Stipulated Order for Abatement in Case No. 6177-4, Chiquita…
