Landfill Gas Collection and Control Equipment Unplanned Down Time on 4/7/2026 at 1:15am
Landfill Gas Collection and Control Equipment Unplanned Down Time on 4/7/2026 at 1:15am On Tuesday, April 7, 2026, Chiquita experienced unplanned downtime of Flare 2 at 1:15am due to flame failure. This downtime was anticipated to last for up to 1 hour and 45 minutes. Due to this downtime, there may be a possibility of…
