Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/27/2024
On November 27, 2024, Chiquita experienced unplanned downtime of Flare 3 due to installation of an electrical meter. Flare 3 was down for approximately 6 hours and 24 minutes. Due to this downtime, there was a possibility of increased odors in the community during the indicated time period. Under Condition 81 of the Modified Stipulated…