Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 1/13/2025 at 9:53am
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 1/13/2025 at 9:53am On Monday, January 13, 2025, Chiquita experienced unplanned downtime of Flares 1, 2, and 3 and the Zeeco thermal oxidizer due to a Public Safety Power Shutoff (PSPS) event conducted by Southern California Edison. Due to this downtime, there is a…
