Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 7/22/2026 at 12:20 pm
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 7/22/2026 at 12:20 pm As previously noticed, on Wednesday, July 22, 2026, Chiquita experienced planned downtime of the Zeeco TOx #7 at 8:00 am to modify the overhead power lines. The Zeeco TOx #7 resumed operations by July 22, 2026, at approximately 12:20 pm.…
