Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/13/2026 at 12:28am; Resumed Operation on 11/13/2026 by 5:40am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/13/2026 at 12:28am; Resumed Operation on 11/13/2026 by 5:40am On Friday, November 13, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 12:28am due to flame failure and Flare 3 at approximately 12:29am due to high flow. Flares 2 and 3 resumed operation…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/12/2026 at 10:11pm; Resumed Operation on 11/12/2026 by 11:02pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/12/2026 at 10:11pm; Resumed Operation on 11/12/2026 by 11:02pm On Thursday, November 12, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 10:11pm due to flame failure and Flare 3 at approximately 10:14pm due to high flow. Flares 2 and 3 resumed operation…

Read article