Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/8/2026 at 9:20pm; Resumed Operation on 11/8/2026 by 10:06pm
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 11/8/2026 at 9:20pm; Resumed Operation on 11/8/2026 by 10:06pm On Sunday, November 8, 2026, Chiquita experienced unplanned downtime of Flares 2 and 3 at approximately 9:20pm due to flame failure and high flow, respectively. Flare 3 resumed operation on November 8, 2026, at approximately…
