Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 10/26/2026 at 2:37am; Resumed Operation on 10/26/2026 by 3:22am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 10/26/2026 at 2:37am; Resumed Operation on 10/26/2026 by 3:22am On Monday, October 26, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 2:37am due to flame failure and Flare 3 at approximately 2:38am due to high gas flow. Flare 2 and Flare 3…

Read article