Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 10/24/2026 at 10:28pm; Resumed Operation on 10/24/2026 by 11:02pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 10/24/2026 at 10:28pm; Resumed Operation on 10/24/2026 by 11:02pm On Saturday, October 24, 2026, Chiquita experienced unplanned downtime of Flare 3 at 10:28pm due to flame failure. Flare 3 resumed operation on October 24, 2026, at approximately 11:02pm. Under Condition 81 of the Modified…

Read article

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 10/24/2026 at 10:30pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 10/24/2026 at 10:30pm On Saturday, October 24, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 10:30pm due to flame failure. Flare 2 resumed operation at approximately 11:20pm but experienced another brief downtime at approximately 11:56pm, which lasted less than 30 minutes. On…