Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 10/22/2026 by 9:16am
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 10/22/2026 by 9:16am As previously noticed, on Thursday, October 22, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 7:42am due to flame failure. Flare 2 resumed operation by Thursday, October 22, 2026, at approximately 9:16am. Under Condition 81 of the Modified Stipulated…
