Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 10/11/2026 at 1:00pm; Resumed Operation on 10/11/2026 by 6:30pm
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 10/11/2026 at 1:00pm; Resumed Operation on 10/11/2026 by 6:30pm On Sunday, October 11, 2026, Chiquita experienced unplanned downtime of Flares 2 and 3 at approximately 1:00pm due to flame failure. Flare 2 resumed operation on October 11, 2026, at approximately 6:15pm, and Flare 3…
