Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 10/9/2026 at 11:30pm; Resumed Operation on 10/10/2026 by 8:33am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 10/9/2026 at 11:30pm; Resumed Operation on 10/10/2026 by 8:33am On Friday, October 9, 2026, Chiquita experienced unplanned downtime of Flares 2 and 3 at approximately 11:30pm due to flame failure. Flares 2 and 3 resumed operation on October 10, 2026, at approximately 8:33am. Due…

Read article