Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 10/1/2026 by 1:50pm
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 10/1/2026 by 1:50pm As previously noticed, on Thursday, October 1, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 2:36am due to flame failure. Flare 2 resumed operation by October 1, 2026, at approximately 1:50pm. Under Condition 81 of the Modified Stipulated Order…
