Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/31/2026 at 8:36 pm; Resumed Operation on 8/31/2026 by 10:09 pm

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/31/2026 at 8:36 pm; Resumed Operation on 8/31/2026 by 10:09 pm On Monday, August 31, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 8:36 pm due to flame failure. Flare 2 resumed operation on August 31, 2026, at approximately 10:09 pm. The…

Read article