Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/31/2026 at 1:25 am; Resumed Operation on 8/31/2026 by 6:09 am

Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 8/31/2026 at 1:25 am; Resumed Operation on 8/31/2026 by 6:09 am On Monday, August 31, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 1:25 am due to flame failure. Flare 2 was restarted at 2:05 am, but then experienced another downtime event…

Read article