Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 8/22/2026 at 9:20am
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 8/22/2026 at 9:20am As previously noticed, on Saturday, August 22, 2026, Chiquita experienced unplanned downtime of Flare 2 at approximately 2:19am due to flame failure. Flare 2 resumed operations by August 22, 2026, at approximately 9:20am. Under Condition 81 of the Modified Stipulated Order…
