Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 8/10/2026 at 10:45am
Alert: Resumed Operation of Landfill Gas Collection and Control Equipment on 8/10/2026 at 10:45am As previously noticed, on Saturday, August 8, 2026, Chiquita experienced unplanned downtime of the Parnel TOx at approximately 11:06am due to flame failure. The Parnel TOx resumed operations by August 10, 2026, at approximately 10:45am. Under Condition 81 of the Modified…
