Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/1/2026 at 5:02 am; Resumed Operation on 7/1/2026 by 6:36 am
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 7/1/2026 at 5:02 am; Resumed Operation on 7/1/2026 by 6:36 am On Wednesday, July 1, 2026, Chiquita experienced unplanned downtime of the Zeeco TOx #6 at approximately 5:02 am due to a leak associated with the Zeeco TOx #1 flow meter. The Zeeco TOx…
