Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 5/5/2026 at 1:30 pm
Alert: Landfill Gas Collection and Control Equipment Unplanned Down Time on 5/5/2026 at 1:30 pm On Tuesday, May 5, 2026, Chiquita experienced unplanned downtime of the Zeeco TOx at 1:30 pm due to pilot failure. This downtime is anticipated to last for up to 40 minutes. Due to this downtime, there may be a possibility…
